• About
    • About
    • Board and Staff
    • Documents
    • WSCO Orientation
    • Videos
    • WSCO in the News
  • Housing
  • Environment
  • Community Care
    • Community Care
    • The West Side Black, Indigenous and Womxn of Color Table
    • Public Safety
    • Trans and Queer Community
  • Blog
  • Events
  • Get Involved
    • Get Involved
    • West Side Voices Forum
    • Get Updates
    • Contact Us
    • Job Openings
  • Resources
  • Donate
  • West Side History
  • Equitable Development
Menu
  • Home >
  • Blog

East Stevens Sewer Lining Project

By Robert Craft  ·  April 02, 2020
02
April 2020

From City Postcard to affected Residents

“WHAT TO EXPECT DURING SEWER REHABILITATION”
CITY OF ST PAUL SEWER LINING PROJECT
Spring Thru Fall 2020


The City of St Paul needs to rehabilitate the sanitary sewer that serves your property. Instead of digging up the street and installing a new sewer pipe, the sewer will be repaired by installing a pipe liner within the existing sewer. There is no assessment to property owners for this work. The cost of this work is funded by your sewer usage fees.

City Council Ward 2 – Sewer Rehab Work Locations
On Street - East Stevens
From Street - Robert
To Street - State



What you need to do:

• Watch for notification from contractor via door hanger, telephone, or face to face.
• Property owners and/or building managers: please distribute this notification postcard.
• Adhere to parking restrictions and temporary traffic control measures.

On the day of sewer lining:
o Your sewer service will be blocked and out of service.
o Please pour one gallon of water into all floor drains to restrict potential odors.
o Please don't use water. Water usage will cause your sewer to back-up.
• If you smell a glue-like odor inside your house and/or experience sewer problems, contact the City Inspector.
• If your property isn’t indicated on this postcard, you can use water but it’s still advised to pour water in your drains.

What the contractor will do:
• Mobilize equipment, restrict parking, and install temporary traffic control measures.
• Clean the sewer and rehabilitate it by installing a sewer liner.
• Notify you one week prior to blocking off your sewer service.
• Notify you one day prior to blocking off your sewer service.
• Block off your sewer service on the day of sewer lining.

Project Note from Luke Holifield:
"This project has not begun yet, but the furthest out I can let you know when the work would occur is 3 weeks.
There are only two streets we will be working on in Ward 2: One in the West Side district and one in the Capitol River district.
Respectively, these two streets are Stevens St, between Robert St and State St, and Wacouta St, between 4th St and Kellogg Blvd.
On both of these streets we are only putting in a short liner.
A short liner is used to cover a hole in the pipe as a minor repair; the condition of the rest of the pipe is good.
The installation of these short liners does NOT impede residents or businesses ability to use water."

City of Saint Paul
Sewer Maintenance
419 Burgess St
St Paul, MN 551117
651-266-9850
City Contacts
Luke Holifield, Project Inspector at the City of Saint Paul Sewer Utility.
Phone: 651-266-9828, Email: [email protected]
or
Shawn O’Keefe, Sewer Maintenance Engineer.
Phone: 651-266-9840, Email: [email protected]
For more information on this project visit: https://www.stpaul.gov/departments/public-works/sewer-utility-divison/pipelining-investing-future

City Council Ward 2 – Sewer Rehab Work Locations
On Street - Stevens
From Street - Robert
To Street - State

On Street - Wacouta
From Street - 4th
To Street - Kellogg

Click here for Ward 2 Project Map Document

Click here for Ward 2 Postcard Document

Do you like this post?
Tweet
Find an Event Get Updates
  • Subscribe with RSS

Sign up for news and updates


The West Side Community Organization powers the people of the West Side to work together to create a vibrant and thriving neighborhood for all. We envision a just, united, self-reliant and bold West Side where all our people a connected, safe, healthy and successful.
[email protected]  | 209 Page St. W. Saint Paul, MN 55107  |   (651) 293-1708
About   Contact   Donate  Get Involved  Subscribe 
West Side Community Orgaization
209 Page Street West
Saint Paul, MN 55107
(651) 293-1708
Created with NationBuilder